Chapel and schoolroom, Barnsley
ArrivedLot RL-0400, bought 10 Nov from Brayfield Demolition.
- ArrivedUnloaded, waiting to be sortedToday 08:15
- Stage 1Sort and stack
- Stage 2Knock off old mortar
- Stage 3Clean by hand
- Stage 4Final clean and band
- QC 1Frost, crack and spall check
- QC 2Size, colour and face grading
- GradedSorted into lines, waiting for a bay
- In stockStacked and on all three stores
Grading plan
Graded at QC. Until then the lot is costed at the line's average yield.
Not graded yet
Unloaded at 08:15 this morning; Gary has the photos. Waiting for a cleaning slot.